Mon–Fri 7–5 · After-hours emergency line  ·  Fresno & the Central Valley CSLB Lic. #895361
TRUE SERVICE ELECTRIC
Home/Commercial/Code Compliance & Title 24

Code Compliance & Title 24

A new code cycle took effect on January 1, 2026. If your last project was permitted under the old one, some of what you know is out of date.

Get this handled

Book a visit with an arrival window, or call and talk it through with someone who knows the answer.

Three parking-lot light poles glowing at dusk on a rooftop deck, with hills in the distance.

What changed on January 1, 2026

Permit applications submitted on or after January 1, 2026 fall under the 2025 Building Energy Efficiency Standards, the 2025 California Electrical Code (based on the 2023 NEC), and the 2025 CALGreen standards. The short version of what it means for a commercial building in Fresno:

  • Lighting controls tightened again. The Tailored Method is gone. Daylight-responsive controls now trigger at 75 watts of general lighting in a daylit zone, with an exception for secondary sidelit zones under 85 watts. General lighting must dim continuously from 100 percent down to 10 — legacy HID and induction sources need only one control step between 30 and 70 percent.
  • Sign lighting is restricted to LED and neon. High pressure sodium, metal halide, fluorescent and CFL signs no longer comply.
  • Battery energy storage is mandatory on new buildings that require photovoltaic.
  • Newly constructed commercial kitchens must be built electric-ready, with branch circuits and service capacity sized for electric cooking equipment. Healthcare and already-all-electric kitchens are exempt. This attaches to new construction — a remodel of an existing kitchen is a different question, and worth asking before you design around it.
  • CALGreen EV requirements scale by parking count and now trigger on alterations, including adding parking, installing solar over spaces, or electrical work requiring trenching. Restriping alone does not trigger them.

Where we help

  • Reading a project against the current cycle before you are deep into design
  • Lighting control design and acceptance testing
  • Load calculations and service capacity planning for electric-ready requirements
  • EV infrastructure counts and rough-in
  • Correcting deficiencies found at inspection or during due diligence

Why we put this on a page

Very few contractors in this market publish anything about Title 24. That is not because it stopped mattering — it is because code pages are unglamorous and hard to keep current. You should be able to read what changed before you are standing in front of an inspector, so here it is.

Questions we get

Frequently asked

Does this apply to my existing building?
Generally the standards attach at permit. Ordinary operation of an existing building does not trigger them — a permitted alteration usually does, and the CALGreen EV rules have their own trigger list.
Can you handle acceptance testing?
Talk to us about the specific scope. Some acceptance testing requires a certified technician of a particular type, and we will tell you plainly whether that is us or someone we bring in.
Get it handled

Tell us what is going on.

Call and talk to someone, or pick a day and an arrival window online. Either way you get a real answer, not a callback promise.

Call (559) 264-3707 Book Online